Home / Operation Cement Roller

Operation Cement Roller

2019523After the mill was in operation for over 10000 hours the roller and table wear rates have been measured 2 times once through each method Described above roller segment rotation and rewelding of both the table and roller liners The actual wear rate for both the roller and table liners before hardfacing was 030 gT.

What Can I Do For You?

Related Posts

shangwutong